Equipment & Facilities
In order to enter the ranks of the world's advanced steel joint enterprises at an early date and strive hard.
The main equipment and facilities include: BF, 4 sets, 450m 3, Sintering Machine, 2 sets, 180m2, Hot Metal Pre-treatment, 2 sets, Converter, 3 sets, 120t, LF, 2 sets, VOD, 1 set, Continuous Caster, 2 sets, Mould Caster, 1 set, BFG/LDG Generator, 2 sets, TRT Generator, 2 sets, De-Sulphur Equipment, 2 sets, One Sewage Treatment Plant, DOW, One Hot Rolled Steel Plate Line (2800/2700mm), and One Wide-Heavy Plate Line (5000 mm).